Rich2001
Mechanical
- Mar 23, 2001
- 896
There was a partial collapse of a parking garage near Penn State on September 4th.
Part of the structure was a slab on grade with a retaining wall. That portion is still in place. The other part was framed as follows:
[ul][li]asphalt topping on [/li][li]
concrete-topping on [/li][li]
DOX plank floor system (essentially, a panelized prefabricated [/li][li]
assembly of concrete block with rebar grouted into voids near the tension face of the panel) framing between lines of steel girders, both cantilevered and drop-in spans, over
steel columns [/li][li]
masonry shear walls at the perimeter [/li][/ul]
Part of the structure was a slab on grade with a retaining wall. That portion is still in place. The other part was framed as follows:
[ul][li]asphalt topping on [/li][li]
concrete-topping on [/li][li]
DOX plank floor system (essentially, a panelized prefabricated [/li][li]
assembly of concrete block with rebar grouted into voids near the tension face of the panel) framing between lines of steel girders, both cantilevered and drop-in spans, over
steel columns [/li][li]
masonry shear walls at the perimeter [/li][/ul]