I'm a structural engineer working on a one story pre-cast concrete parking deck project supported by H-piles. Now that construction of the foundations is nearly complete, we've been asked if another level can be added (Until this point we had been specifically directed NOT to design for additional floors). Among the many issues is the fact that even though we may have enough capacity in the piles themselves, the caps won't support the additional punching shear load. There is only aboout a foot or less to work with from top of cap to top of floor slab. I'm asking for ideas or experiences in dealing with this problem.