Question: How long do you wait for someone in the office to get back to you with a helpful piece of information.
I'm in O&M and recenlty ask someone in Engineering Construction (E&C) for their latest numbers on site construction costs including excavation, backfill, compaction and concrete. It isn't something I'm required to do on a regular basis otherwise I would probably have the information handy.
I need the information for a conceptual cost estimate of facility to compare some options using NPV. Not a huge request assuming they have spreadsheets to do these types of quick calculations.
So to sum up how long do you wait? I waited a week since the first phone call before I sent a reminder e-mail (today). I've got a copy of an old RS Means should I crack it? I'd rather have the most up to date local numbers though.
Oh and yes the person did offer assistance.
I'm in O&M and recenlty ask someone in Engineering Construction (E&C) for their latest numbers on site construction costs including excavation, backfill, compaction and concrete. It isn't something I'm required to do on a regular basis otherwise I would probably have the information handy.
I need the information for a conceptual cost estimate of facility to compare some options using NPV. Not a huge request assuming they have spreadsheets to do these types of quick calculations.
So to sum up how long do you wait? I waited a week since the first phone call before I sent a reminder e-mail (today). I've got a copy of an old RS Means should I crack it? I'd rather have the most up to date local numbers though.
Oh and yes the person did offer assistance.