invent11
Mechanical
- Sep 10, 2007
- 47
In our plant we have a tank with capacity of 340000 lit. We intend to use instrument air and pressurize it to 20 kPa to look for leaks. A pressure regulating valve connects plant instrument air at 860 kPa through a 1/2" line to the tank and can provide 20 Kpa at 7.6 L/s. How long does it take to fill the tank? Apparently this method has been used in the past and we are told it took days to pressurize the tank. Appreciate If you could let me know the governing equations and your estimate for the time needed.