tmlim
Structural
- Feb 15, 2005
- 31
I'm working on a house with a steel stud embedded in EPS foundation wall. The wall is 8' high. I was told that I need to have washrock to within 12" of the final grade. So it comes out to about 6ft of washrock. Does this makes sense?? I thought washrock was only needed for about 12" above the weeping tile.