waterwitch
Civil/Environmental
- Jul 2, 2008
- 9
I am trying to run a dambreach model and need to attach a storage area to the upstream end of reach/cross section.
I have a sample problem that is already set up that way. The storage area editor shows a storage area - cross section connection.
I have tried several colleagues and no seems to know how to do it.
Any ideas?
I have a sample problem that is already set up that way. The storage area editor shows a storage area - cross section connection.
I have tried several colleagues and no seems to know how to do it.
Any ideas?