Dear specialist
I have been honoured with the commissioning task of a H2SO4 injection to a cooling tower system. It consist of a peristaltic pump taking suction on a 10000l H2SO4 drum and a, about 500m 1 ½” stainless line, ending in the cooling tower base. The transport line has low point drains. The line has been hydraulically tested months ago and maybe most of the water has been removed. The suggestions made are to start with a mock operation and run it on water. I am not so positive to this suggestion and more concerned about the removal of the water. Can someone out there give me some advice?
koekoek
I have been honoured with the commissioning task of a H2SO4 injection to a cooling tower system. It consist of a peristaltic pump taking suction on a 10000l H2SO4 drum and a, about 500m 1 ½” stainless line, ending in the cooling tower base. The transport line has low point drains. The line has been hydraulically tested months ago and maybe most of the water has been removed. The suggestions made are to start with a mock operation and run it on water. I am not so positive to this suggestion and more concerned about the removal of the water. Can someone out there give me some advice?
koekoek