bbakk
Civil/Environmental
- Mar 25, 2001
- 14
Would one of you experts out there give me the low down on the various compaction requirements such as aashto t99/t180 (the maximum density and optimum moisture test) and the inplace density and moisture test AASHTO T-310. I guess my question is if I instruct the contractor to compact the granular base to 95% of maximum dry density per aashto T-180, is it the same as specifying 95% of maximum density per AASHTO T-310 (the inplace density and moisture test)?
an example specification (is this conflicting and or redundant?):
1. IMMEDIATELY FOLLOWING FINE GRADING OPERATIONS PROOF ROLL SUBGRADE OF NEW PAVED AREAS TO ACHIEVE AT LEAST 95% OF THE MAXIMUM DENSITY FOR A 12" DEPTH PER AASHTO T-310. MOISTURE CONTENT AT THE TIME OF COMPACTING THE MATERIALS SHALL BE PREPARED TO WITHIN MINUS 4% TO PLUS 2% OF OPTIMUM MOISTURE CONTENT PER AASHTO T-180. EMBANKMENTS OR FILLS ARE TO BE CONSTRUCTED IN 6" MAXIMUM LIFTS, WITH EACH LIFT BEING COMPACTED TO 95% OF MAXIMUM DENSITY PRIOR TO PROCEEDING WITH THE NEXT LIFT. AREAS RECEIVING STRUCTURAL FILL ARE TO BE TESTED BY A QUALIFIED TESTING LAB.
Thanks in advance.
brb
an example specification (is this conflicting and or redundant?):
1. IMMEDIATELY FOLLOWING FINE GRADING OPERATIONS PROOF ROLL SUBGRADE OF NEW PAVED AREAS TO ACHIEVE AT LEAST 95% OF THE MAXIMUM DENSITY FOR A 12" DEPTH PER AASHTO T-310. MOISTURE CONTENT AT THE TIME OF COMPACTING THE MATERIALS SHALL BE PREPARED TO WITHIN MINUS 4% TO PLUS 2% OF OPTIMUM MOISTURE CONTENT PER AASHTO T-180. EMBANKMENTS OR FILLS ARE TO BE CONSTRUCTED IN 6" MAXIMUM LIFTS, WITH EACH LIFT BEING COMPACTED TO 95% OF MAXIMUM DENSITY PRIOR TO PROCEEDING WITH THE NEXT LIFT. AREAS RECEIVING STRUCTURAL FILL ARE TO BE TESTED BY A QUALIFIED TESTING LAB.
Thanks in advance.
brb