To anyone;
I am not that versed in the art of grading but we had an engineer that quit our firm. Anyway, we had a project that he did and the grading contractor is asking for the control points on the grading plan. I was asked to look at the layout and he specified spot elevations throughout the design. However, I do not see a referenced survey control points. Should I just have the grading contractor reference the original survey with that as the referenced control points?
Thanks
I am not that versed in the art of grading but we had an engineer that quit our firm. Anyway, we had a project that he did and the grading contractor is asking for the control points on the grading plan. I was asked to look at the layout and he specified spot elevations throughout the design. However, I do not see a referenced survey control points. Should I just have the grading contractor reference the original survey with that as the referenced control points?