cmarotta
Mechanical
- Dec 19, 2008
- 4
Is there a way to write a script or macro to run consecutive transient thermal analyses in Geostar? Currently, we start an analysis with 1 second time steps for 200 seconds, then restart the analysis with longer time steps.