jartgo
Civil/Environmental
- Oct 20, 2005
- 220
My firm is in discussions with the possibility of bringing in a landscape architect and offer those services, mostly to public clients. Can you all give a general percentage base for determining fees of that nature? Of course every project is different, but for civil engineering for a public works project you can sometimes use 15% as a rule of thumb to get you in the ballpark for costs of design and construction admin. Is there a similar rule of thumb for landscape architecture?