bob74r
Industrial
- Nov 25, 2009
- 19
We are just about to begin on our first FRP (bell and spigot 20 to 40 BAR)job and numerous people involved have little experience with this product. We do have two third parties to look over things in progress. But there is a specification requirement that both parties seems to disagree on. (Note one side is a representative of the manufacture)
One side claims the taper angle is required to be messuared while the other (manufacture )claims they've never done it before.
My question is this has anybody who has dealt with bell and spigot FRP before measured the taper length on the spigot and bell? and if so how did you do it? (Nether side can come up with a real or agreeable way in which to accomplish this)
Any help would be great
One side claims the taper angle is required to be messuared while the other (manufacture )claims they've never done it before.
My question is this has anybody who has dealt with bell and spigot FRP before measured the taper length on the spigot and bell? and if so how did you do it? (Nether side can come up with a real or agreeable way in which to accomplish this)
Any help would be great