johnhan76
Civil/Environmental
- May 16, 2002
- 123
I am working in a flat topographical area. Our pipes are allowed to surcharge provided that the HGL doesnt reach the street. What type of factor of safety should I use if any. I am already designing for the 25 year storm and I am using the SCS method (conservative( to size the pipes. Thanks.