kafo
Structural
- Apr 1, 2010
- 1
My design for a 15m-28.8m-13m-28.8m-15m spans bridge was based on using RC precast girders for 15 and 13 m spans while prestressed precast Girders are used for the 28.8 span. I separated all spans with expansion joints. I think this is better to separate RC from prestressed girders due to different creep and shrinkage. Now the reviewer objects and ask me to redesign using continuity slab all over the bridge "jointless". How can i defend my theory and can you support me with a reference on the topic that can help me defend my design against the reviewer comments? Thanks!