I am dealing with a new RTU (aprox. 4000#) over an existing concrete T-joist roof. Ts are 20” deep, 30” oc. Each panel is 5’ long with 2 Ts thus. The existing drawings show the moments for which the T manufacturer had to design for but I can’t figure out two things:
1) The design moments shown on the existing drawings: I am assuming these to be factored, is that reasonable?
2) The moment call out does not clearly say whether this moment is for a single T or the whole panel (2 Ts). I am assuming this is for one T.
Kaiser
I am dealing with a new RTU (aprox. 4000#) over an existing concrete T-joist roof. Ts are 20” deep, 30” oc. Each panel is 5’ long with 2 Ts thus. The existing drawings show the moments for which the T manufacturer had to design for but I can’t figure out two things:
1) The design moments shown on the existing drawings: I am assuming these to be factored, is that reasonable?
2) The moment call out does not clearly say whether this moment is for a single T or the whole panel (2 Ts). I am assuming this is for one T.
Kaiser