IJR
Structural
- Dec 23, 2000
- 774
Unless I am wrong(as usual huh huh), excel allows one to change date formats but not the language. I mean the 3rd of march can be 08/03 or 3Mar or March 3 etc but not 3Mart as would be in a different language. Apparently it refers to whatever Regional settings are there in The Control Panel.
Does anyone want to tell us how I can fool excel by formula or code to switch between languages(only as related to dates)? I sometimes need this utility.
Regs
IJR
Does anyone want to tell us how I can fool excel by formula or code to switch between languages(only as related to dates)? I sometimes need this utility.
Regs
IJR