dirtsqueezer
Geotechnical
- Jan 29, 2002
- 269
I am working on a project where the plans specify epoxy dowel installation according to ICBO ER-5193 (also allows for Simpson SET). My question is, is there a standard minimum embedment depth specified for a certain size bar that one can use on a jobsite (that's what the plans imply)? I think this contractor is looking for a catch-all for his beam-to-slab, curb-to-slab, slab-to-wall, ect. connections.
PS. None of these embedments, or dowels for that matter, are on the plans themselves.
PS. None of these embedments, or dowels for that matter, are on the plans themselves.