OSUCivlEng
Civil/Environmental
- Jan 12, 2009
- 275
I was recently reviewing an engineering scope and fee proposal between a municipality and a design engineer for a city street and was a little bit surprised when I got to the fee portion of the proposal. Has anyone ever seen anything like this before? Isn't there a conflict of interest if you directly set your fee based on construction cost? Yes we often use a percent of construction to come up with a fee, but it's a fixed fee. Just curious what others think. This in the US if it matters.
PAYMENT
Surveying: Lump sum payment upon completion
Engineering: Lump sum payment equal to 5% of the lowest bid.
or
Engineering: Lump sum payment equal to 5% of the construction estimate when advertising is
delayed for 30 calendar days or more.
PAYMENT
Surveying: Lump sum payment upon completion
Engineering: Lump sum payment equal to 5% of the lowest bid.
or
Engineering: Lump sum payment equal to 5% of the construction estimate when advertising is
delayed for 30 calendar days or more.