Nuno Coelho
Electrical
- Aug 9, 2017
- 3
Hi gents,
I have to design electrical heat tracing in a dual chamber bypass level gauge, but so far I couldn't find any tips or standards on how to put the electrical cable around the gauge correctly. Basically the gauge has two flanged process connections and two tubes in parallel, on the top of each tube there is a guided wave level transmitter. Does anyone know how to do it properly?
Thank you!
I have to design electrical heat tracing in a dual chamber bypass level gauge, but so far I couldn't find any tips or standards on how to put the electrical cable around the gauge correctly. Basically the gauge has two flanged process connections and two tubes in parallel, on the top of each tube there is a guided wave level transmitter. Does anyone know how to do it properly?
Thank you!