dblackman
Mechanical
- Jun 28, 2002
- 1
I'm looking for a way to cool thread adaptors after they are projection welded onto steel tubes. I need an inline system that allows a part to be cooled in about 25 - 30 seconds as I need to keep the one for one flow. The cooling is required for pressure testing directly afterwards that currently gives errors with hot parts.
Any ideas?
Any ideas?