shorebob
Geotechnical
- Oct 18, 2003
- 13
For designing soldier beam walls to retain backfill, I usually include an add-on pressure for compactive effort. Is this pressure residual, or, like traffic surchage, is it only present during actual backfill operations? I'm currently using a methodology from the Canadian Foundation Manual, 4th Ed. Any others out there?