kronosconcrete
Civil/Environmental
- Jan 29, 2001
- 11
I'm designing a slab on grade (post tensioned) on fractured granite base that will support columns for a three story residence. The rebar will be the minimum 1%. Slab flatness is very important. How can I embed into the slab to come to the top of the slab so vibratory screeding isn't interfered with. Then I need to tie in the rebar above the slab for the columns.
Thanks for any ideas.
Thanks for any ideas.