McQSE
Structural
- Feb 4, 2008
- 60
Has anyone ever taken plans back because you could not get paid?
My situation:
Residential remodel project (structural)
Homeowner responsible for payment
Work is through builder (good relationship with builder)
Construction has not started
Homeowner keeps telling me the money is coming
I am thinking about getting the plans back from the builder and telling the homeowner that he can have the plans when I get paid. I have a good relationship with the builder so it would not be a problem to get the plans. I know the builder will have multiple copies that he has given to subs that I will not be able to get back. However, the main point is to try to get some leverage on the homeowner. I am thinking that if he thinks his remodel will be postponed until he pays me then maybe he will really send the check instead of lying about sending it.
Does this sound foolish? Any input is appreciated.
My situation:
Residential remodel project (structural)
Homeowner responsible for payment
Work is through builder (good relationship with builder)
Construction has not started
Homeowner keeps telling me the money is coming
I am thinking about getting the plans back from the builder and telling the homeowner that he can have the plans when I get paid. I have a good relationship with the builder so it would not be a problem to get the plans. I know the builder will have multiple copies that he has given to subs that I will not be able to get back. However, the main point is to try to get some leverage on the homeowner. I am thinking that if he thinks his remodel will be postponed until he pays me then maybe he will really send the check instead of lying about sending it.
Does this sound foolish? Any input is appreciated.