There are a couple of Tie-in/Closure joints to be welded in the project, I am involved right now. No possibility of Leak test/Hydrotest.
Project spec is ASME B31.3(100% RT),and
I would like to know is there any requirement of UT and cut bevel MT/UT,additional to RT specified by the Code.
I couldn't see that requirement in B31.3..am I right..
I have done earlier UT,cut bevel MT additional to RT in other projects,but that was as per project spec.
Thanks
There are a couple of Tie-in/Closure joints to be welded in the project, I am involved right now. No possibility of Leak test/Hydrotest.
Project spec is ASME B31.3(100% RT),and
I would like to know is there any requirement of UT and cut bevel MT/UT,additional to RT specified by the Code.
I couldn't see that requirement in B31.3..am I right..
I have done earlier UT,cut bevel MT additional to RT in other projects,but that was as per project spec.
Thanks