My client is driving 100' long, closed end, pipe piles, approx. 24" diameter for a wharf. The plans call for the upper portion (about 20') of the pile to be concreted. Does anyone have any good reasons why or why shou;dn't the pile should be totally dewatered inside and below the concrete plug? If the pile is dewatered inside, there will be a very high water pressure on the outside of the pile. If the pile is allowed to have water in it below the concrete plug, the unbalanced water pressure on the outside of the pile will be minimal.
Any thoughts, warnings, known problems?