I have an application that i have been trying to use calculations from a different post and am having some trouble.
I have a customer that is wanting to remove a leg from their platform to allow for a conveyor to travel under it. See attached file. There are 2 angles as a beam across the platform (6 x 3 1/2 x 51/6 and 3 1/2 x 3 1/2 x 5/16) inertias came to 10.9 + 2.45 (modulus 5.42 + 2.47). Used a beam calc to determine stress and deflection. Total load on platform at one time will be 1500 + SW (550lb to Solidworks) I add 25% to SW to be safe. Total of 2188 lbs.
Thru beam calcs, I determined I needed to add one C6 to keep a stress SF of 10. Deflection was a non factor.
My major concern is the bolts. The pull stress of the 6 bolts holding this side up. Obviously there will be some stress transferred to the other leg, however I want to be sure there won't be any issues. I am looking at this if i were to be cantilevering with only the 6 bolts, worse case.
No one at my company knows how to do this, I need to prove this before giving the go ahead.
I am trying to use BD #2 on and i cant seem to determine where they are getting some of their numbers.
Any help would be greatly appreciated.
Thanks
I have a customer that is wanting to remove a leg from their platform to allow for a conveyor to travel under it. See attached file. There are 2 angles as a beam across the platform (6 x 3 1/2 x 51/6 and 3 1/2 x 3 1/2 x 5/16) inertias came to 10.9 + 2.45 (modulus 5.42 + 2.47). Used a beam calc to determine stress and deflection. Total load on platform at one time will be 1500 + SW (550lb to Solidworks) I add 25% to SW to be safe. Total of 2188 lbs.
Thru beam calcs, I determined I needed to add one C6 to keep a stress SF of 10. Deflection was a non factor.
My major concern is the bolts. The pull stress of the 6 bolts holding this side up. Obviously there will be some stress transferred to the other leg, however I want to be sure there won't be any issues. I am looking at this if i were to be cantilevering with only the 6 bolts, worse case.
No one at my company knows how to do this, I need to prove this before giving the go ahead.
I am trying to use BD #2 on and i cant seem to determine where they are getting some of their numbers.
Any help would be greatly appreciated.
Thanks