dragondipaula
Structural
- Oct 3, 2008
- 7
Does anyone have a way of stopping water intrusion into a pile cap while I excavate, chip piles down, set the rebar mats, and then place concrete in a pile cap. Other than well point. Multiple pile caps but, the largest is about 15'x13'. Here are the tricky parts.
1. Under an active airport terminal, with the closest daylight area about 500' away.
2. Soil is contaminated and thus the water smells like old jet fuel.
3. Encounter ground water at approximatly 2' into the excavation, going 4' deep.
1. Under an active airport terminal, with the closest daylight area about 500' away.
2. Soil is contaminated and thus the water smells like old jet fuel.
3. Encounter ground water at approximatly 2' into the excavation, going 4' deep.