gelsi
Chemical
- Oct 18, 2010
- 81
Hi,
an auto regulation device of upstream pressure loses its seal while the downstream pipeline is blocked in; so the pressure rises to the set value and the PSV start opening. The leakage flow is a very low fraction of nominal flowrate od PSV, for example 1% or minus. What scenarious you think is true:
1 - the PSV opens to a middle position and than recloses when pressure reaches the blowdown, after a some time reopens, and so on;
2 - the PSV opens and remains opened at a middle position all the time.
I like 2, heven if it is a PSV for gas.
Thanks
an auto regulation device of upstream pressure loses its seal while the downstream pipeline is blocked in; so the pressure rises to the set value and the PSV start opening. The leakage flow is a very low fraction of nominal flowrate od PSV, for example 1% or minus. What scenarious you think is true:
1 - the PSV opens to a middle position and than recloses when pressure reaches the blowdown, after a some time reopens, and so on;
2 - the PSV opens and remains opened at a middle position all the time.
I like 2, heven if it is a PSV for gas.
Thanks