JeromeDC
Industrial
- Jul 14, 2006
- 2
Hello everyone, I am new to the manufacturing industry and I am having a problem trying to figure out how to balance our assembly line. I have already collected data on the cycle times for the 26 different operations on the line. Once this data was graphed, the Takt time was calculated and shows that all of our processes are below (which is good), however the graph also shows that our line is very very unbalanced. Seeing as this is my first foray into this line balancing issue, I was hoping someone can help me answer a few questions in general for line balancing.
I understand the concept of balancing a line for example, if station 1 takes 20 sec per part, station 2 takes 25 sec per part, station 3 takes 15 sec per part, and station 4 takes 20 sec per part, then you would want to balance stations 2 and 3 so that all have equal cycle times (please correct me if I am wrong).
The first question I have is: am I collecting the data in the correct way? According to the data I have gathered, it looks like there are a whole bunch of operators that are standing around, but this is very minimal throughout the process.
Next is the times I have gathered are operational times, so do I need to collect the downtimes in between each operation? If so, do I collect it from end to beginning for each operation (for the next part), or from how long it takes the part to get to the next operation?
Once I have collected some of this information, my next question is how do I use all this to balance the line?
Finally, I am sure I have left out many details (which I can give), but is there anywhere I can get better examples of line balancing on the net? I have been searching for the past couple of weeks and cannot find anything to help me balance this line. Thanks in advance for any advice/help and I hope to hear from you all soon!!!
Jerome Dela Cruz
I understand the concept of balancing a line for example, if station 1 takes 20 sec per part, station 2 takes 25 sec per part, station 3 takes 15 sec per part, and station 4 takes 20 sec per part, then you would want to balance stations 2 and 3 so that all have equal cycle times (please correct me if I am wrong).
The first question I have is: am I collecting the data in the correct way? According to the data I have gathered, it looks like there are a whole bunch of operators that are standing around, but this is very minimal throughout the process.
Next is the times I have gathered are operational times, so do I need to collect the downtimes in between each operation? If so, do I collect it from end to beginning for each operation (for the next part), or from how long it takes the part to get to the next operation?
Once I have collected some of this information, my next question is how do I use all this to balance the line?
Finally, I am sure I have left out many details (which I can give), but is there anywhere I can get better examples of line balancing on the net? I have been searching for the past couple of weeks and cannot find anything to help me balance this line. Thanks in advance for any advice/help and I hope to hear from you all soon!!!
Jerome Dela Cruz