Does anybody have any experience or opinions about an appropriate structural coefficient to use in pavement design for asphalt millings placed instead of an aggregate base course (ABC) layer beneath asphalt pavement?
The millings will not have any emulsion, rejuvenators, or additives of any kind such as would be used for Cold In Place Recycled Asphalt (CIPR). It will simply be milled from existing pavement, stockpiled, and then compacted as a base course layer. My gut feel is that this material would be at least as good as ABC which is normally taken as having a coefficient of 0.12 in my area of practice. I have done some research and found that CIPR coefficients are usually taken as 0.25 to 0.35, but this will not be CIPR. Any studies or references would be helpful.
The actual structural coefficient will be a function of the placement density which in turn will depend at least partially (or perhaps significantly) on the placement temperature and gradation, binder, etc. of the existing asphalt pavement that will be milled. The state DOT has a laboratory procedure to establish a maximum wet density which is essentially a one point modified Proctor. Any thoughts on what percentage of maximum should be specified would be appreciated as well.
Thanks in advance for any suggestions.
The millings will not have any emulsion, rejuvenators, or additives of any kind such as would be used for Cold In Place Recycled Asphalt (CIPR). It will simply be milled from existing pavement, stockpiled, and then compacted as a base course layer. My gut feel is that this material would be at least as good as ABC which is normally taken as having a coefficient of 0.12 in my area of practice. I have done some research and found that CIPR coefficients are usually taken as 0.25 to 0.35, but this will not be CIPR. Any studies or references would be helpful.
The actual structural coefficient will be a function of the placement density which in turn will depend at least partially (or perhaps significantly) on the placement temperature and gradation, binder, etc. of the existing asphalt pavement that will be milled. The state DOT has a laboratory procedure to establish a maximum wet density which is essentially a one point modified Proctor. Any thoughts on what percentage of maximum should be specified would be appreciated as well.
Thanks in advance for any suggestions.