Hi all - just wanted to preface this thread by saying you guys are all fantastic contributors and I have learned quite a bit by reading through some of the responses.
My question however, is in regard to certifying PV's post-manufacturing. We have an ASME 8 Div 1 tank with 1 liquid phase inlet and 1 gas phase inlet, but we need a second liquid phase inlet installed. In speaking with some of the certifying authorities (BV, CCS, DNV, etc.), some say it would take 2 months just to get the drawing certified, not to mention the work to be done on the tank itself.
I am well aware that ASME 8 Div 1 only pertains to new builds.
Anyone have any idea about this sort of procedure? Thanks in advance and keep up the good work!
-Paul
My question however, is in regard to certifying PV's post-manufacturing. We have an ASME 8 Div 1 tank with 1 liquid phase inlet and 1 gas phase inlet, but we need a second liquid phase inlet installed. In speaking with some of the certifying authorities (BV, CCS, DNV, etc.), some say it would take 2 months just to get the drawing certified, not to mention the work to be done on the tank itself.
I am well aware that ASME 8 Div 1 only pertains to new builds.
Anyone have any idea about this sort of procedure? Thanks in advance and keep up the good work!
-Paul