98604
Mechanical
- Jan 21, 2010
- 1
I work in plumbing design for a plumbing contractor. Part of my duties is to complete the as-built drawings for each job and turn them in with the O&Ms. When I mark up a set of drawings, should I be removing the PE stamp and the engineering firm's information from the drawing?