rashy70
Electrical
- Feb 19, 2009
- 7
I am trying to use ARC flash Analysis using ETAP 7.0 , but ETAP has limitation that the source Protective device shall be with in 20 bus from the faulted bus. Can we do the study if the Protective Device is away about 50 bus.
Can we apply arc flash analysis for the distribution overhead lines ? Please suggest
Can we apply arc flash analysis for the distribution overhead lines ? Please suggest