Eduard47
Mechanical
- May 16, 2002
- 18
Sometimes back I encountered a pipe stress model that generated one of the highest at 95% of the allowable on operating load case. I was then a bit worry of the closeness to the maximum allowable limit untill somebody told me that it is okey. Technically it is stil within the allowable and is supposed to be consider safe. My mentor has told me 2 years ago the lower the better and of course it makes sense to me. My question from the experts around is: Is the % allowable be limited to figures below 100% for any longterm effect (say not > 90%? Any effect on fatigue stress, creep etc. that may cause failure on the future? Thanks again for a professional help.
Eduard
Eduard