- 8
Hi i am an electrical engineer!! .The area to be airconditioned is large Airport Terminal building with ground and first floor .The celilig height from floor is 4.5 MTR for both ground and first floorarea.I have normally seen that we use either ceiling area (Covered with false ceiling)or Flooring (Covered with false flooring) for running the Air conditiong ducts from heat exchanger to the the area to be conditioned and the return air is collected through the false ceiling/Flooring itself. I was given to understand that the Air conditioning can be provided along with the coloumn area through high velocity discharge nozzles to avoid the ducting in the ceiling area .Can anyone suggest how this arrangements is possible . Is the basement necessarry for airconditioning through Colomn ?.or can any one suggest any other arrangement to provide Aitconditioning system without running ducts through celieng /flooring area. Fan coil units and package type units may be not possible sine the area is very big.