I am considering the use of ACIP-D piles in lieu of "standard" ACIP to reduce the volume of spoils (excavated soil).
Would like to inquire if anyone has had some enlightening experience with ACIP-D.
In particular:
How much reduction in spoils can be expected?
What are the different types of ACIP-D piles / methods that should be considered?
Is any modification to the geotech. design required?
Is there a significant cost increase for ACIP-D?
Does the installation equipment for ACIP-D require greater vertical or horizontal clearances and access?
Thank you in advance for any experiences you can share.
Would like to inquire if anyone has had some enlightening experience with ACIP-D.
In particular:
How much reduction in spoils can be expected?
What are the different types of ACIP-D piles / methods that should be considered?
Is any modification to the geotech. design required?
Is there a significant cost increase for ACIP-D?
Does the installation equipment for ACIP-D require greater vertical or horizontal clearances and access?
Thank you in advance for any experiences you can share.