ProjectEng
Chemical
- Nov 6, 2002
- 55
We have concentrated bulk HCl storage on site. We also have a supply and return HCl header that is always pressurized. What is the best way to setup acid injection on the RO feedwater line?
I thought about using a daytank that operators could fill once per week and would draw down and get injected into the 16" feedwater line using a chemical pump. However, the thought of an acid 'daytank' was not well received.
I'm hesitant to just run a line from the acid header to the 16" feedwater line for fear that the regulating valve could fail, causing large amounts of acid to get dumped into the line.
Looking for alternative ideas. Thanks!
ProjectEng