SIAUPA
Mechanical
- Nov 14, 2003
- 18
I modelled a 24" steam line that is connected at one end to an existing pipe line coming from plant equipment and at the opposite end to an existing pipe line going into a steam header.
For a complete analysis I include at each end a section of the existing line. This existing line section is from my tie-in point going up to the first left and right anchor.
Is this correct?
Also just because I am connecting to a line, my guess is that the loading on the equipment nozzles where my existing lines are connected is not part of my concern.
Is this true?
For a complete analysis I include at each end a section of the existing line. This existing line section is from my tie-in point going up to the first left and right anchor.
Is this correct?
Also just because I am connecting to a line, my guess is that the loading on the equipment nozzles where my existing lines are connected is not part of my concern.
Is this true?