Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Recent content by aussiemike

  1. aussiemike

    Converting TF humus tanks for BNR

    G'day All. I recently recommended one of my clients (running a municipal WWTP) should replace his old 1940s rock media trickling filters with an MLE bioreactor for a number of indisputable reasons. I expect to be engaged to prepare detailed designs for this upgrade in the new year some time...
  2. aussiemike

    Excessive nitrogen in wastewater. Need treatment.

    Nitrification / denitrification in an activated sludge process may work. [Ammonia to Nitrates (aerobic) to Nitrogen gas (anoxic).] Standard configurations may be time based (intermittent eg. SBR) or continuous (MLE, A2O etc etc). Post your wastewater details and give us a look! Cheers.
  3. aussiemike

    HDPE Pipe Abrasion Resistance

    Hi MRF I have seen ABS, PE, DI and glass lined steel pipes used for grit slurry in STPs. Because you want to pump grit at a reasonable velocity, the grit pumps must run intermittently at full speed. In conjunction with this, the pump duty head tends to fluctuate due to the non-homogeneous...
  4. aussiemike

    Forced air flow in pumped outfall

    check out my reply to your identical post on the other forum
  5. aussiemike

    Area Required for Waste Water Treatment

    If this sizing figure is Average Dry Weather Flow, you are talking about a very large plant. 1000ML/day ADWF is equivalent to the load from a city of around 4 million people. Is this correct? I strongly suggest you engage a consultant to prepare you some concept layouts for a plant this size...
  6. aussiemike

    Lift Station Float Elevations

    The cut out float should be set a distance above the floor in accordance with the minimum pump submergence provided by the pump supplier. The lead pump should be set above cut out to give an active volume so you don't exceed your pump starts. The lag pump (depending on your philosophy) can be...
  7. aussiemike

    Forced air flow in pumped outfall

    Hi Stephen. It sounds like a problem you would like to design out if you can. Can you allow the outfall to flow by gravity (bypassing the pump station) until the effluent pipe flows full and backs up into the pump chamber? This would ensure the pipe was full of effluent before the pump...
  8. aussiemike

    Iron & Manganese Removal

    I know of at least one RO plant here in Australia that was rendered virtually useless by the presence of iron and manganese in the borewater feed. The feedwater was delivered to a break tank upstream of the RO unit - heavily aerating it in the process - and presumably increasing the fouling...
  9. aussiemike

    Ventilation of Enclosed Primary Clarifiers

    I have worked on a couple of projects where ventilation of primary clarifiers was required. There are a couple of low cover designs that I am aware of. One consists of an HDPE sheet with suitable supports to cover the clarifier and scraper mechanisms. The other consists of pie shaped...
  10. aussiemike

    Retrofitting AC pipe

    I'm not sure if I fully understand the problem. Are you saying you cannot scour the line and you need to cut into it while it is full? If you are simply after a suitable flanged adaptor for AC pipe, try Baker or Straub. They have clamp on flanged fittings for most types of pipe. Cheers
  11. aussiemike

    Negative pressure head

    It doesn't sound quite right. Unless there is an error with the negative sign, this implies your pump is acting as a turbine! It is possible the assumptions you have used in your model don't match reality. Is any part of the pipe flowing part full? Can you give us a more detailed...
  12. aussiemike

    Disposal of trickling filter rocks

    I am currently managing a project that involves the decommissioning and demolition of an old rock media trickling filter sewage treatment plant. (The flow from the plant is soon to be diverted to a shiny new BNR plant across the river. Ooops, looks like they missed the entire activated sludge...
  13. aussiemike

    Force Main Pumping Downhill

    Got it in one. I'm with Parsons Brinckerhoff (formerly PPK). I was design team leader for the transfer systems, which includes all the major pumping stations and pipelines. Also had fairly significant input to the ocean outfall and outfall pumping station. Illawarra was/is a great job to...
  14. aussiemike

    Force Main Pumping Downhill

    G'day All. Allow me to throw in my ten cents worth.... I have just finished the design of a 590L/s sewage pumping station near Sydney - currently under construction. The pumps are 180kW (2 duty / 2 standby) with variable speed drives. The flow is level controlled within a range 120L/s to...

Part and Inventory Search