We have a 150 hp motor that I am thinking of putting a
Frequency Drive on. My goal is to save money on our demand
portion of our Electic Bill. Could explain the following.
1. What is the First Demand Block and the Second Demand
Block ?
2. Are these 1 time blocks during the billing cycle ,or
do they create a new block according to a higher demand?
3. During these blocks,do they sample a few times during,
lets say a 15 min. or a 30 min. block? Is there a pulse?
4. Lets say if I start this 150 hp (Across the line)and I
have the following: (For example 15 sec.)
Start up 784.0 kw for 5 sec.
99.2 kw for 5 sec.
99.2 kw for 5 sec.
784.0 kw + 99.2 kw + 99.2 kw = 982.4 kw
982.4 / 3 = 327.46 kw
Is 327.46 kw what the demand charge would be based on?
Below is our Demand portion of our bill.
Billing Units Charge Rate Charge
First Demand Block 500.0 1.72 $860.00
Second Demand Block 630.0 1.69 $1,064.70
Total Demand Charge 1,130.0 $1,924.70
I may be off track , I would appreiate any help.
Thanks in advance,
Frequency Drive on. My goal is to save money on our demand
portion of our Electic Bill. Could explain the following.
1. What is the First Demand Block and the Second Demand
Block ?
2. Are these 1 time blocks during the billing cycle ,or
do they create a new block according to a higher demand?
3. During these blocks,do they sample a few times during,
lets say a 15 min. or a 30 min. block? Is there a pulse?
4. Lets say if I start this 150 hp (Across the line)and I
have the following: (For example 15 sec.)
Start up 784.0 kw for 5 sec.
99.2 kw for 5 sec.
99.2 kw for 5 sec.
784.0 kw + 99.2 kw + 99.2 kw = 982.4 kw
982.4 / 3 = 327.46 kw
Is 327.46 kw what the demand charge would be based on?
Below is our Demand portion of our bill.
Billing Units Charge Rate Charge
First Demand Block 500.0 1.72 $860.00
Second Demand Block 630.0 1.69 $1,064.70
Total Demand Charge 1,130.0 $1,924.70
I may be off track , I would appreiate any help.
Thanks in advance,