My company is reclaiming an old quarry for real estate development and a storm water bypass sewer system consisting of 84" RCP needs to be installed. I don't understand why they are going to fill the quarry up with soil first to the proposed ground elevation and then go back to dig trenches up to 25ft deep for the pipes to rest in. Whats wrong with laying out the sewer system first at the correct elevation and then burying the whole thing in soil?