MarkGallimore
Mechanical
- Oct 6, 2006
- 12
In an industrial laboratory environment - (metalurgical / chemical lab) - which is likely to be more available a) split phase wiring which would allow me to get a 240v supply from the two hot legs b) 3 phase wye wiring which would allow me to get a 208v supply or c) both are usually available in the same lab. I've a heater in some equipment which is borderline in capacity and the prospect of only having 208v available might mean I can't get sufficient heat from my equipment.
Cheers
Mark
Cheers
Mark