griffgj
Mechanical
- May 11, 2003
- 2
I'm sure I'm going to start this thread with very vague information (basically due to my lack of knowledge in this subject). Anyway, two concrete runway's were poured for a boat lift on four wheels ("Travel-lift" if you will). The weight of this alone is around 4 ton. It picks up boats in the range of 60 ton. The ramp's diminsions are 50' long x 3' across x 1' deep. The form has lots of "I" beams and rebar piled in for support. It's also adequately supported on the bottom with large wooden pilings. The conrete is a 3000 lb mix with fiber. So finally, my question is: how long does it take the concrete to harden enough so this travel lift is able to go on it and lift boats out of the water? The weather might be approiate to list too. It's south alabama so right now around 80-90 F weather. Thanks for your help and let me know what else I need to say.
Griff
Griff