wds1
Structural
- Mar 22, 2004
- 29
I have a 2x6 stud, 10.5' high. When I run the numbers, it can take 5.56k when braced in the weak direction and 0.49k when NOT braced in the weak direction. Can drywall provide the necessary lateral support? If Not, how do they build 2 story houses with walls made of 1/2"dry wall, 2x4 studs, 1/2" rigid insulation, and vinyl siding. A braced 2x4 can carry 2.65k while a unbraced 2x4 can only carry 0.53k.