Hi Guys
I got this question for a vertical pipe, hundreds meter deep for underground mine dewatering.
I'll need to work out the weight to support for the hanger design. No piping engineer to provide the load, unfortunately...
The total pipe weights about 5t and content weights 7t. vertically positioned, lateral controlled every 6 meter.
No expansion, dynamic, water hammer load considerd for now.
For the vertical load, there are 2 supporting options
Option 1
1 hanger hung the pipe from very top, the pump is connected at very bottom.
Therefore will generates a 12t weight for the hanger.
If this is the case, assuming the pipe is strong enough..can the pipe carry 7t content vertically?
Does the content pass whole gravity to the pipe wall through pressure and friction?
I see the reference from Peng engineering ASME mentioned the pipe line load should consider content as line load, not sure if it fits here.
Option 2
1 hanger hung from the very top, and another hanger/support from the very bottom before connecting to pump.
If this is the case, should bottom hanger undertake 60%+ of the total (pipe+content load); the top hanger undertake minimum 50% of the total (pipe+content load)?
Or bottom hanger undertake 7t content + 50% of the pipe load (5t)?
Would appreciated for any comments.
Cheers, Tony
I got this question for a vertical pipe, hundreds meter deep for underground mine dewatering.
I'll need to work out the weight to support for the hanger design. No piping engineer to provide the load, unfortunately...
The total pipe weights about 5t and content weights 7t. vertically positioned, lateral controlled every 6 meter.
No expansion, dynamic, water hammer load considerd for now.
For the vertical load, there are 2 supporting options
Option 1
1 hanger hung the pipe from very top, the pump is connected at very bottom.
Therefore will generates a 12t weight for the hanger.
If this is the case, assuming the pipe is strong enough..can the pipe carry 7t content vertically?
Does the content pass whole gravity to the pipe wall through pressure and friction?
I see the reference from Peng engineering ASME mentioned the pipe line load should consider content as line load, not sure if it fits here.
Option 2
1 hanger hung from the very top, and another hanger/support from the very bottom before connecting to pump.
If this is the case, should bottom hanger undertake 60%+ of the total (pipe+content load); the top hanger undertake minimum 50% of the total (pipe+content load)?
Or bottom hanger undertake 7t content + 50% of the pipe load (5t)?
Would appreciated for any comments.
Cheers, Tony