imad123
Civil/Environmental
- Dec 21, 2008
- 9
I am new on Hec-Ras and my company is interested in development of small hydroelectric project.
I have been assigned duty modelling of a river and small lake with fall. proposal is to put a small weir of 2 meter high to just maintane the level of water.
The task is how to model the river reache of almost 1 KM and lake also.
I need step by step procedure to model the river and the lake to see the flooded area during PMF.
There is also littel hydrological data avaiable but we will get the data from other same catchment.
I will appreciate if some one can guide me proceduare or any material.
Thanks
I have been assigned duty modelling of a river and small lake with fall. proposal is to put a small weir of 2 meter high to just maintane the level of water.
The task is how to model the river reache of almost 1 KM and lake also.
I need step by step procedure to model the river and the lake to see the flooded area during PMF.
There is also littel hydrological data avaiable but we will get the data from other same catchment.
I will appreciate if some one can guide me proceduare or any material.
Thanks