What are the common techniques used to deal with new tunnels next to pile foundations.
I am thinking of designing the tunnel to transfer the pile lateral loads through the lining structure. Is this the best way?
Another option is to investigate by calculation, the redundancy of part of the pile near the tunnel. If possible to form a soft zone near the tunnel to avoid load tranfer. I foresee many problems with this approach and prefer the former.
NB