One year ago, a new sewer line was installed down the middle of an existing street. The total length of the trench is about 2 miles. The width of the trench was about 10 feet. The backfill material consisted of gravelly soils and compacted to about 90 percent according to the inspector. However, there was no full-time inspection during compaction. The top of the pipe is about 25 feet below street grade. Now the trench has settled in some areas as much as 12 inches. Has anyone come across this problem before, if you have, what were your recommendations for the repair of the trench settlement.