briand2
Mechanical
- Jan 15, 2002
- 180
My experience extends only to 11kV within buildings, so apologies for what may be a trivial question...
Once a new transmission line (say 400kV) has been constructed and commissioned, are any tests carried out to check its real performance / ampacity. (I'm aware of the type testing of the cables, etc before construction, but what if, for some reason, the completed construction does not perform, i.e. it gets too hot / sags too much / impedance too high, etc).
Thank you in advance for your help.
Brian
Once a new transmission line (say 400kV) has been constructed and commissioned, are any tests carried out to check its real performance / ampacity. (I'm aware of the type testing of the cables, etc before construction, but what if, for some reason, the completed construction does not perform, i.e. it gets too hot / sags too much / impedance too high, etc).
Thank you in advance for your help.
Brian