TheLinker
Structural
- Nov 16, 2004
- 18
I am currently designing a foundation / blast wall system for an electrical transformer ( greater then 5,000 gal). I have the separation and line of sight requirements to determine the height of the wall but looking at FM Global, IEEE and NFPA, I do not find a way to determine the design blast force to apply to the wall.
Does anyone have experience or references on how to determine the blast force on a wall a certain distance from a fuel source? or are there are code provisions on how to determine the design loads required on a blast wall for a transformer?
Does anyone have experience or references on how to determine the blast force on a wall a certain distance from a fuel source? or are there are code provisions on how to determine the design loads required on a blast wall for a transformer?